PROJECT TITLE :

Cost of Ownership/Yield Enhancement of High Volume Immersion Lithography Using Topcoat-Less Resists

ABSTRACT:

The complexity and extra cost associated with a resist topcoat layer has motivated the industry to transition to topcoat-less (TC-less) resist processes. By switching to TC-less resists, track suppliers are able to achieve higher throughput using less costly equipment, scanner suppliers can increase the scanning speed of their litho systems with minimized risk of defects, and end users eliminate a process step and gain increased output at a lower cost. These factors become increasingly critical as a result of the heightened processing complexities associated with double patterning lithography. In addition to reduction in process complexity benefits, a topcoat-less process must also satisfy the other critical performance criteria, and results for overlay, autofocus, and imaging will be discussed. To justify transition to a new process, there also should be demonstration of associated cost reduction or productivity improvements.


Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here


PROJECT TITLE : Redundancy Minimization and Cost Reduction for Workflows with Reliability Requirements in Cloud-Based Services ABSTRACT: When it comes to the execution of workflows using cloud-based services, reliability requirement
PROJECT TITLE :Interference Prediction in Partially Loaded Cellular Networks Using Asymmetric Cost Functions - 2018ABSTRACT:The traffic patterns of users during a base station coupled with the sub-frame blanking due to HetNets
PROJECT TITLE :An Ant Colony Optimization Based Approach for Minimum Cost Coverage on 3-D Grid in Wireless Sensor Networks - 2018ABSTRACT:The application of swarm intelligence algorithms to wireless sensor networks (WSNs) deployment
PROJECT TITLE :TrafficShaper: Shaping Inter-Datacenter Traffic to Reduce the Transmission Cost - 2018ABSTRACT:The emerging deployment of geographically distributed information centers (DCs) incurs a significant quantity of data
PROJECT TITLE :A Non-Monetary Mechanism for Optimal Rate Control Through Efficient Cost Allocation - 2018ABSTRACT:This Project proposes a practical non-financial mechanism that induces the efficient answer to the optimal rate

Ready to Complete Your Academic MTech Project Work In Affordable Price ?

Project Enquiry