PROJECT TITLE :

Resource Scheduling and Delay Analysis for Workflow in Wireless Small Cloud - 2018

ABSTRACT:

This Project studies resource scheduling for wireless tiny cloud assuming that the execution of an application is modeled as a workflow graph. A scheduling methodology is proposed which consists of two elements. For the task-to-computing-unit assignment part that operates on the long-term time-scale, the answer is to partition the workflow into task groups that have loose data transfer constraint and every task cluster is assigned to the computing unit that can finish executing the task group at the earliest time. For the computing and wireless Communication resource scheduling part which operates on the short-term time-scale, we have a tendency to merely use the spherical-robin principle. A half by part delay part estimation methodology is presented based on that the typical delay performance will be analyzed. Simulation results validate the theoretical analysis and show that the proposed technique outperforms existing methods. The impact of various parameter settings on the system performance is additionally investigated.


Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here


PROJECT TITLE : Resource estimation in T20 cricket ABSTRACT: While the Duckworth-Lewis technique (originally devised for one-day cricket) has been used in international T20 matches as well as the Indian Premier League, there have
PROJECT TITLE :Towards Max-Min Fair Resource Allocation for Stream Big Data Analytics in Shared Clouds - 2018ABSTRACT:Distributed stream huge information analytics platforms have emerged to tackle the continuously generated
PROJECT TITLE :Resource Allocation in Cognitive Underlay System With Uncertain Interference Channel’s Statistics - 2018ABSTRACT:In this letter, resource allocation is investigated for multiple pairs of secondary users during
PROJECT TITLE :Asynchronous Incremental Stochastic Dual Descent Algorithm for Network Resource Allocation - 2018ABSTRACT:Stochastic network optimization problems entail finding resource allocation policies that are optimum on
PROJECT TITLE :Socially Aware Secrecy-Ensured Resource Allocation in D2D Underlay Communication: An Overlapping Coalitional Game Scheme - 2018ABSTRACT:With the recognition of proximity-based mostly services, device-to-device

Ready to Complete Your Academic MTech Project Work In Affordable Price ?

Project Enquiry