MTech Projects MTech Projects
  • HOME
  • MTECH PROJECTS
    • COMPUTER SCIENCE
      • MTech Python Projects
        • Machine Learning Projects
        • Deep Learning Projects
        • Blockchain Projects
        • django Projects
      • MTech Java Projects
        • Cloud Computing Projects
        • Data Mining Projects
        • Mobile Computing Projects
        • Networking Projects
      • MTech NS2 Projects
        • Wireless Communication Projects
        • Vehicular Technology Projects
      • MTech Hadoop Projects
      • MTech Android Projects
    • ELECTRONICS
      • MTech DSP Projects
      • MTech DIP Projects
      • MTech VLSI Projects
      • MTech Communication Projects
    • ELECTRICAL
      • MTech Power Systems Projects
      • MTech Power Electronics Projects
      • MTech Control Systems Projects
    • OTHER
      • Chemical Projects
      • Mechanical Projects
      • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Contact Us

  • Street Number 4, Jawahar Nagar, RTC X Road, Hyderabad 500044
  • +91 9573777164
  • info@mtechprojects.com

Welcome to MTech Projects - Online Projects for MTech Students

  • My Account
  • Careers
  • Downloads
  • Blog
MTech Projects MTech Projects
  • Email Us
  • Phone Number
  • Open Hours
  • HOME
  • MTECH PROJECTS

    MTech Python Projects

    • Machine Learning Projects
    • Deep Learning Projects
    • Blockchain Projects
    • django Projects

    MTECH JAVA PROJECTS

    • Cloud Computing Projects
    • Data Mining Projects
    • Mobile Computing Projects
    • Networking Projects

    MTECH NS2 PROJECTS

    • Wireless Communication Projects
    • Vehicular Technology Projects
    • MTech Hadoop Projects
    • MTech Android Projects

    ELECTRONICS

    • MTech DSP Projects
    • MTech DIP Projects
    • MTech VLSI Projects
    • MTech Communication Projects

    ELECTRICAL

    • MTech Power Systems Projects
    • MTech Power Electronics Projects
    • MTech Control Systems Projects

    OTHER

    • Chemical Projects
    • Mechanical Projects
    • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Project Enquiry

  1. You are here:  
  2. Home
  3. IEEE MTECH VLSI ( VHDL/VERILOG ) PROJECTS
  4. Critical Path Analysis and Low Complexity Implementation of the LMS Adaptive Algorithm - 2014
Details
Category: MTECH VLSI ( VHDL/VERILOG ) PROJECTS
By MTech Projects
MTech Projects
27.Mar
Hits: 39

Critical Path Analysis and Low Complexity Implementation of the LMS Adaptive Algorithm - 2014

PROJECT TITLE:

Critical Path Analysis and Low Complexity Implementation of the LMS Adaptive Algorithm - 2014

ABSTRACT:

This project presents a precise analysis of the critical path of the least-mean-square (LMS) adaptive filter for deriving its architectures for high-speed and low-complexity implementation. It is shown that the direct-form LMS adaptive filter has nearly the same critical path as its transpose-form counterpart, but provides much faster convergence and lower register complexity. From the critical-path evaluation, it is further shown that no pipelining is required for implementing a direct-form LMS adaptive filter for most practical cases, and can be realized with a very small adaptation delay in cases where a very high sampling rate is required. Based on these findings, this project proposes three structures of the LMS adaptive filter: (i) Design 1 having no adaptation delays, (ii) Design 2 with only one adaptation delay, and (iii) Design 3 with two adaptation delays. Design 1 involves the minimum area and the minimum energy per sample (EPS). The best of existing direct-form structures requires 80.4% more area and 41.9% more EPS compared to Design 1. Designs 2 and 3 involve slightly more EPS than the Design 1 but offer nearly twice and thrice the MUF at a cost of 55.0% and 60.6% more area, respectively.

Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here

  • A Highly-Scalable Analog Equalizer Using a Tunable and Current-Reusable Active Inductor for 10-Gb/s I/O Links - 2015
  • Design and simulation of single layered Logic Generator Block using Quantum Dot Cellular Automata - 2015
  • A Methodology for Optimized Design of Secure Differential Logic Gates for DPA Resistant Circuits
  • Run-time reconfigurable multi-precision floating point multiplier design for high speed, low-power applications - 2015
  • FPGA realization and performance evaluation of fixed-width modified Baugh-Wooley multiplier - 2015
  • An Overview of Advance Microcontroller Bus Architecture Relate on AHB Bridge - 2014
  • Energy-Efficient Approximate Multiplication for Digital Signal Processing and Classification Applications - 2015
  • A Novel Quantum-Dot Cellular Automata X-bit x 32-bit SRAM - 2016
  • Reverse Converter Design via Parallel Prefix Adders Novel Components Methodology and Implementations - 2014
  • Fault Tolerant Parallel FFTs Using Error Correction Codes and Parseval Checks - 2016
Previous article: Design Flow for Flip Flop Grouping in Data Driven Clock Gating - 2014 Design Flow for Flip Flop Grouping in Data Driven Clock Gating - 2014 Next article: Arithmetic Based Binary to RNS Converter Modulo {2n ± k} for jn-Bit Dynamic Range - 2014 Arithmetic Based Binary to RNS Converter Modulo {2n ± k} for jn-Bit Dynamic Range - 2014
COMPUTER SCIENCE PROJECTS ELECTRONICS PROJECTS MTech DSP Projects MTech DIP Projects MTech VLSI Projects MTech VHDL Projects MTech Verilog Projects MTech Communication Projects ELECTRICAL PROJECTS EMBEDDED PROJECTS MECHANICAL PROJECTS

sell academic m.tech, btech and be projects online

sell academic m.tech, btech and be projects online

Research Paper Writing Services

QUICK LINKS

  • Python Projects List
  • Java Projects with Source Code in NetBeans
  • Android Projects Download
  • Core Java Projects
  • Simple Python Projects
  • Android Projects with Source Code in Android Studio
  • Segmentation in Image Processing
  • Python Projects with Database
  • Digital Signal Processing pdf
  • Image Processing Using Python
  • VLSI Projects for Final Year ECE
  • Power Electronic Projects
  • Power System Projects
  • VLSI Projects for MTech
  • Power System Projects using Matlab
  • Power Electronics and Drives
SUPPORT
+91 9573777164
9:00am - 6:00pm IST
info@mtechprojects.com

Navigate

  • ABOUT
  • TESTIMONIALS
  • FIND A DEALER
  • CAREERS

CONTACT

  • CONTACT
  • FAQ
  • RESOURCES
  • EMAIL US

Useful links

  • REFUND & RETURN POLICY
  • PRIVACY POLICIES

Support

  • FACEBOOK
  • TWITTER
  • PINTEREST
  • GOOGLE PLUS

Disclaimer : MTech Projects, is not associated or affiliated with IEEE, in any way. The mentioned IEEE Projects here are student projects inspired by ideas from IEEE publications, not projects conducted by or associated with IEEE.

Talk to us?

Copyright © 2009 - 2026 MTech Projects. All Rights Reserved.
CALL NOW
ASK EXPERT