MTech Projects MTech Projects
  • HOME
  • MTECH PROJECTS
    • COMPUTER SCIENCE
      • MTech Python Projects
        • Machine Learning Projects
        • Deep Learning Projects
        • Blockchain Projects
        • django Projects
      • MTech Java Projects
        • Cloud Computing Projects
        • Data Mining Projects
        • Mobile Computing Projects
        • Networking Projects
      • MTech NS2 Projects
        • Wireless Communication Projects
        • Vehicular Technology Projects
      • MTech Hadoop Projects
      • MTech Android Projects
    • ELECTRONICS
      • MTech DSP Projects
      • MTech DIP Projects
      • MTech VLSI Projects
      • MTech Communication Projects
    • ELECTRICAL
      • MTech Power Systems Projects
      • MTech Power Electronics Projects
      • MTech Control Systems Projects
    • OTHER
      • Chemical Projects
      • Mechanical Projects
      • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Contact Us

  • Street Number 4, Jawahar Nagar, RTC X Road, Hyderabad 500044
  • +91 9573777164
  • info@mtechprojects.com

Welcome to MTech Projects - Online Projects for MTech Students

  • My Account
  • Careers
  • Downloads
  • Blog
MTech Projects MTech Projects
  • Email Us
  • Phone Number
  • Open Hours
  • HOME
  • MTECH PROJECTS

    MTech Python Projects

    • Machine Learning Projects
    • Deep Learning Projects
    • Blockchain Projects
    • django Projects

    MTECH JAVA PROJECTS

    • Cloud Computing Projects
    • Data Mining Projects
    • Mobile Computing Projects
    • Networking Projects

    MTECH NS2 PROJECTS

    • Wireless Communication Projects
    • Vehicular Technology Projects
    • MTech Hadoop Projects
    • MTech Android Projects

    ELECTRONICS

    • MTech DSP Projects
    • MTech DIP Projects
    • MTech VLSI Projects
    • MTech Communication Projects

    ELECTRICAL

    • MTech Power Systems Projects
    • MTech Power Electronics Projects
    • MTech Control Systems Projects

    OTHER

    • Chemical Projects
    • Mechanical Projects
    • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Project Enquiry

  1. You are here:  
  2. Home
  3. MTech VLSI Projects
  4. Delay Analysis for Current Mode Threshold Logic Gate Designs - 2017
Details
Category: MTech VLSI Projects
By MTech Projects
MTech Projects
11.Oct
Hits: 75

Delay Analysis for Current Mode Threshold Logic Gate Designs - 2017

PROJECT TITLE :

Delay Analysis for Current Mode Threshold Logic Gate Designs - 2017

ABSTRACT:

Current mode may be a in style CMOS-based implementation of threshold logic functions, where the gate delay depends on the sensor size. This paper presents a brand new implementation of current mode threshold functions for improved gate delay and switching energy. An analytical method is also proposed in order to identify quickly the sensor size that minimizes the gate delay. Simulation results on completely different gates implemented using the optimum sensor size indicate that the proposed current mode implementation technique outperforms consistently the prevailing implementations in delay as well as switching energy.

Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here

  • PEVA: A Page Endurance Variance Aware Strategy for the Lifetime Extension of NAND Flash - 2016
  • Design of CRC (Cyclic Redundancy Check) Generator (Verilog)
  • A Dynamically Reconfigurable Multi-ASIP Architecture for Multi standard and Multimode Turbo Decoding - 2015
  • Design of 8-bit Microcontroller (VHDL)
  • Analysis of 8 bit RCA adder at different nanometer regime - 2016
  • Optimal Design of Reversible Parity Preserving New Full Adder / Full Subtractor - 2017
  • A Low-Power Robust Easily Cascaded Penta MTJ-Based Combinational and Sequential Circuits - 2016
  • Performance/Power Space Exploration for Binary64 Division Units - 2016
  • Area and Energy-Efficient Complementary Dual-Modular Redundancy Dynamic Memory for Space Applications - 2017
  • Design and Analysis of Approximate Compressors for Multiplication - 2015
  • HSPICE VLSI
Previous article: A Mapping Methodology of Boolean Logic Circuits on Memristor Crossbar - 2017 A Mapping Methodology of Boolean Logic Circuits on Memristor Crossbar - 2017 Next article: A High-Speed and Power-Efficient Voltage Level Shifter for Dual-Supply Applications - 2017 A High-Speed and Power-Efficient Voltage Level Shifter for Dual-Supply Applications - 2017
COMPUTER SCIENCE PROJECTS ELECTRONICS PROJECTS MTech DSP Projects MTech DIP Projects MTech VLSI Projects MTech VHDL Projects MTech Verilog Projects MTech Communication Projects ELECTRICAL PROJECTS EMBEDDED PROJECTS MECHANICAL PROJECTS

sell academic m.tech, btech and be projects online

sell academic m.tech, btech and be projects online

Research Paper Writing Services

QUICK LINKS

  • Python Projects
  • Java Projects
  • Android Projects
  • Digital Signal Processing
  • Image Processing Projects
  • VLSI Projects
  • Power Systems
  • Power Electronics
SUPPORT
+91 9573777164
9:00am - 6:00pm IST
info@mtechprojects.com

Navigate

  • ABOUT
  • TESTIMONIALS
  • FIND A DEALER
  • CAREERS

CONTACT

  • CONTACT
  • FAQ
  • RESOURCES
  • EMAIL US

Useful links

  • REFUND & RETURN POLICY
  • PRIVACY POLICIES

Support

  • FACEBOOK
  • TWITTER
  • PINTEREST
  • GOOGLE PLUS

Disclaimer : MTech Projects, is not associated or affiliated with IEEE, in any way. The mentioned IEEE Projects here are student projects inspired by ideas from IEEE publications, not projects conducted by or associated with IEEE.

Talk to us?

Copyright © 2009 - 2026 MTech Projects. All Rights Reserved.
CALL NOW
ASK EXPERT