MTech Projects
  • HOME
  • MTECH PROJECTS
    • COMPUTER SCIENCE
      • MTech Python Projects
        • Machine Learning Projects
        • Deep Learning Projects
        • Blockchain Projects
        • django Projects
      • MTech Java Projects
        • Cloud Computing Projects
        • Data Mining Projects
        • Mobile Computing Projects
        • Networking Projects
      • MTech NS2 Projects
        • Wireless Communication Projects
        • Vehicular Technology Projects
      • MTech Hadoop Projects
      • MTech Android Projects
    • ELECTRONICS
      • MTech DSP Projects
      • MTech DIP Projects
      • MTech VLSI Projects
      • MTech Communication Projects
    • ELECTRICAL
      • MTech Power Systems Projects
      • MTech Power Electronics Projects
      • MTech Control Systems Projects
    • OTHER
      • Chemical Projects
      • Mechanical Projects
      • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Contact Us

  • Street Number 4, Jawahar Nagar, RTC X Road, Hyderabad 500044
  • +91 9573777164
  • [email protected]

Welcome to MTech Projects - Online Projects for MTech Students

  • My Account
  • Careers
  • Downloads
  • Blog
MTech Projects
  • Email Us
  • Phone Number
  • Open Hours
  • HOME
  • MTECH PROJECTS

    MTech Python Projects

    • Machine Learning Projects
    • Deep Learning Projects
    • Blockchain Projects
    • django Projects

    MTECH JAVA PROJECTS

    • Cloud Computing Projects
    • Data Mining Projects
    • Mobile Computing Projects
    • Networking Projects

    MTECH NS2 PROJECTS

    • Wireless Communication Projects
    • Vehicular Technology Projects
    • MTech Hadoop Projects
    • MTech Android Projects

    ELECTRONICS

    • MTech DSP Projects
    • MTech DIP Projects
    • MTech VLSI Projects
    • MTech Communication Projects

    ELECTRICAL

    • MTech Power Systems Projects
    • MTech Power Electronics Projects
    • MTech Control Systems Projects

    OTHER

    • Chemical Projects
    • Mechanical Projects
    • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Project Enquiry

Details
Category: MTech Java Projects
By MTech Projects
MTech Projects
23.Dec
Hits: 53

Joint Optimal Data Rate and Power Allocation in Lossy Mobile Ad Hoc Networks with Delay-Constrained Traffics - 2015

PROJECT TITLE:

Joint Optimal Data Rate and Power Allocation in Lossy Mobile Ad Hoc Networks with Delay-Constrained Traffics - 2015

ABSTRACT:

In this paper, we tend to take into account lossy mobile circumstantial networks where the information rate of a given flow becomes lower and lower along its routing path. One of the main challenges in lossy mobile impromptu networks is how to achieve the conflicting goal of increased network utility and reduced power consumption, while while not following the instantaneous state of a fading channel. To address this downside, we have a tendency to propose a cross-layer rate-effective network utility maximization (RENUM) framework by taking into account the lossy nature of wireless links and therefore the constraints of rate outage likelihood and average delay. In the proposed framework, the utility is associated with the effective rate received at the destination node of each flow rather than the injection rate at the supply of the flow. We tend to then present a distributed joint transmission rate, link power and average delay management algorithm, in that express broadcast message passing is needed for power allocation algorithm. Motivated by the need of power management devoid of message passing, we provide a close to-optimal power-allocation scheme that creates use of autonomous SINR measurements at each link and enjoys a fast convergence rate. The proposed algorithm is shown through numerical simulations to outperform other network utility maximization algorithms while not rate outage probability/average delay constraints, leading to the next effective rate, lower power consumption and delay. Furthermore, we have a tendency to conduct extensive network-wide simulations in NS-two simulator to judge the performance of the algorithm in terms of throughput, delay, packet delivery ratio and fairness.

Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here

  • Mobile Computing
COMPUTER SCIENCE PROJECTS MTech Python Projects MTech Java Projects MTech .Net Projects MTech NS2 Projects MTech Android Projects MTech Hadoop Projects ELECTRONICS PROJECTS ELECTRICAL PROJECTS EMBEDDED PROJECTS MECHANICAL PROJECTS

sell academic m.tech, btech and be projects online

sell academic m.tech, btech and be projects online

Academic Final Year Projects

QUICK LINKS

  • Python Projects
  • Java Projects
  • Android Projects
  • Digital Signal Processing
  • Image Processing Projects
  • VLSI Projects
  • Power Systems
  • Power Electronics
SUPPORT
+91 9573777164
9:00am - 6:00pm IST
[email protected]

Navigate

CONTACT

Useful links

Support

Disclaimer : MTech Projects, is not associated or affiliated with IEEE, in any way. The mentioned IEEE Projects here are student projects inspired by ideas from IEEE publications, not projects conducted by or associated with IEEE.

Talk to us?

Copyright © 2009 - 2026 MTech Projects. All Rights Reserved.
CALL NOW
ASK EXPERT