MTech Projects
  • HOME
  • MTECH PROJECTS
    • COMPUTER SCIENCE
      • MTech Python Projects
        • Machine Learning Projects
        • Deep Learning Projects
        • Blockchain Projects
        • django Projects
      • MTech Java Projects
        • Cloud Computing Projects
        • Data Mining Projects
        • Mobile Computing Projects
        • Networking Projects
      • MTech NS2 Projects
        • Wireless Communication Projects
        • Vehicular Technology Projects
      • MTech Hadoop Projects
      • MTech Android Projects
    • ELECTRONICS
      • MTech DSP Projects
      • MTech DIP Projects
      • MTech VLSI Projects
      • MTech Communication Projects
    • ELECTRICAL
      • MTech Power Systems Projects
      • MTech Power Electronics Projects
      • MTech Control Systems Projects
    • OTHER
      • Chemical Projects
      • Mechanical Projects
      • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Contact Us

  • Street Number 4, Jawahar Nagar, RTC X Road, Hyderabad 500044
  • +91 9573777164
  • [email protected]

Welcome to MTech Projects - Online Projects for MTech Students

  • My Account
  • Careers
  • Downloads
  • Blog
MTech Projects
  • Email Us
  • Phone Number
  • Open Hours
  • HOME
  • MTECH PROJECTS

    MTech Python Projects

    • Machine Learning Projects
    • Deep Learning Projects
    • Blockchain Projects
    • django Projects

    MTECH JAVA PROJECTS

    • Cloud Computing Projects
    • Data Mining Projects
    • Mobile Computing Projects
    • Networking Projects

    MTECH NS2 PROJECTS

    • Wireless Communication Projects
    • Vehicular Technology Projects
    • MTech Hadoop Projects
    • MTech Android Projects

    ELECTRONICS

    • MTech DSP Projects
    • MTech DIP Projects
    • MTech VLSI Projects
    • MTech Communication Projects

    ELECTRICAL

    • MTech Power Systems Projects
    • MTech Power Electronics Projects
    • MTech Control Systems Projects

    OTHER

    • Chemical Projects
    • Mechanical Projects
    • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Project Enquiry

Details
Category: Computer-Aided Design of Integrated Circuits and Systems
By MTech Projects
MTech Projects
08.Mar
Hits: 41

Accurate Predictions of Process-Execution Time and Process Status Based on Support-Vector Regression for Enterprise Information Systems

PROJECT TITLE :

Accurate Predictions of Process-Execution Time and Process Status Based on Support-Vector Regression for Enterprise Information Systems

ABSTRACT:

Accurate predictions of both process-execution time and process status are crucial for the development of an intelligent enterprise information system (EIS). We have developed new automated learning-based process-execution time-prediction and process status-prediction methods that can be embedded into an EIS. Process-execution time prediction is a regression problem and state-of-the-art (baseline) time-prediction methods use a machine-learning regression model. Process status prediction is a binary classification problem in which a class labeled “completed” or “in-progress” is assigned to a process with respect to an arbitrary predictive horizon (i.e., the future time given by the method user). The methods proposed in this paper integrate statistical methods with support-vector regression. Comparison results obtained from the real data of a digital-print enterprise show that the proposed time-prediction method reduces both the relative mean error and the root-mean-squared error of the regression model. Furthermore, the proposed status-prediction method not only achieves higher classification accuracy than state-of-the-art methods, it also estimates the probability of the predicted status. In addition, algorithm development and training phases of the proposed methods do not rely on any arbitrary predictive horizon. Therefore, a single time-prediction model as proposed is sufficient for status prediction as opposed to a baseline status-prediction method that requires classification models for all potential predictive horizons.

Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here

COMPUTER SCIENCE PROJECTS ELECTRONICS PROJECTS ELECTRICAL PROJECTS EMBEDDED PROJECTS MECHANICAL PROJECTS

sell academic m.tech, btech and be projects online

sell academic m.tech, btech and be projects online

Academic Final Year Projects

QUICK LINKS

  • Python Projects for Beginners
  • Java Projects for Beginners
  • Android Projects for Beginners
  • IEEE Transactions on Signal Processing
  • Image Processing Techniques
  • IEEE VLSI Projects
  • Power System Projects for EEE
  • Power Electronics Based Projects
SUPPORT
+91 9573777164
9:00am - 6:00pm IST
[email protected]

Navigate

CONTACT

Useful links

Support

Disclaimer : MTech Projects, is not associated or affiliated with IEEE, in any way. The mentioned IEEE Projects here are student projects inspired by ideas from IEEE publications, not projects conducted by or associated with IEEE.

Talk to us?

Copyright © 2009 - 2026 MTech Projects. All Rights Reserved.
CALL NOW
ASK EXPERT