- Details
- Category: MTech VLSI Projects
- By MTech Projects
- Hits: 64
Critical Path Analysis and Low Complexity Implementation of the LMS Adaptive Algorithm - 2014
PROJECT TITLE:
Critical Path Analysis and Low Complexity Implementation of the LMS Adaptive Algorithm - 2014
ABSTRACT:
This project presents a precise analysis of the critical path of the least-mean-square (LMS) adaptive filter for deriving its architectures for high-speed and low-complexity implementation. It is shown that the direct-form LMS adaptive filter has nearly the same critical path as its transpose-form counterpart, but provides much faster convergence and lower register complexity. From the critical-path evaluation, it is further shown that no pipelining is required for implementing a direct-form LMS adaptive filter for most practical cases, and can be realized with a very small adaptation delay in cases where a very high sampling rate is required. Based on these findings, this project proposes three structures of the LMS adaptive filter: (i) Design 1 having no adaptation delays, (ii) Design 2 with only one adaptation delay, and (iii) Design 3 with two adaptation delays. Design 1 involves the minimum area and the minimum energy per sample (EPS). The best of existing direct-form structures requires 80.4% more area and 41.9% more EPS compared to Design 1. Designs 2 and 3 involve slightly more EPS than the Design 1 but offer nearly twice and thrice the MUF at a cost of 55.0% and 60.6% more area, respectively.
Did you like this research project?
To get this research project Guidelines, Training and Code... Click Here


