PROJECT TITLE:

Critical Path Analysis and Low Complexity Implementation of the LMS Adaptive Algorithm - 2014

ABSTRACT:

This project presents a precise analysis of the critical path of the least-mean-square (LMS) adaptive filter for deriving its architectures for high-speed and low-complexity implementation. It is shown that the direct-form LMS adaptive filter has nearly the same critical path as its transpose-form counterpart, but provides much faster convergence and lower register complexity. From the critical-path evaluation, it is further shown that no pipelining is required for implementing a direct-form LMS adaptive filter for most practical cases, and can be realized with a very small adaptation delay in cases where a very high sampling rate is required. Based on these findings, this project proposes three structures of the LMS adaptive filter: (i) Design 1 having no adaptation delays, (ii) Design 2 with only one adaptation delay, and (iii) Design 3 with two adaptation delays. Design 1 involves the minimum area and the minimum energy per sample (EPS). The best of existing direct-form structures requires 80.4% more area and 41.9% more EPS compared to Design 1. Designs 2 and 3 involve slightly more EPS than the Design 1 but offer nearly twice and thrice the MUF at a cost of 55.0% and 60.6% more area, respectively.


Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here

PROJECT TITLE : An In-Network Replica Selection Framework for Latency-Critical Distributed Data Stores ABSTRACT: It is common for the performance of individual servers in distributed data stores to vary, and this is especially
PROJECT TITLE : Attention in Reasoning Dataset, Analysis, and Modeling ABSTRACT: Although attention has become an increasingly popular component in deep neural networks for the purpose of both interpreting data and improving
PROJECT TITLE : The Importance of Context When Recommending TV Content Dataset and Algorithms ABSTRACT: Home entertainment systems are used in a variety of settings with one or more concurrent users, with the complexity of selecting
PROJECT TITLE : Critical Load Restoration using Distributed Energy Resources for Resilient Power Distribution System ABSTRACT: In the face of extreme weather events, the ageing and obsolete power distribution systems have
PROJECT TITLE : Dynamic Performance of Solar PV Integrated UPQC-P for Critical Loads ABSTRACT: These results demonstrate the dynamic performance of an integrated UPQC-P array for critical loads, including a solar photovoltaic