PROJECT TITLE :

Age-Based Replacement Policy With Consideration of Production Wait Time

ABSTRACT:

During this paper, we have a tendency to consider the replacement of a unit that is subject to a dominant failure mode. The unit is usually replaced by an age-based replacement policy, either when a preset age limit has been reached, or when failure occurs before this limit. But, the unit can additionally get replaced when it encounters a random production wait and its age has reached a sure threshold. Using such an opportunity for replacement will help to reduce system downtime. We tend to formulate this joint age-primarily based replacement limit and threshold optimization problem with the target of minimizing the expected cost per unit time in the future. A true-information example is presented to illustrate the applicability and effectiveness of our model.


Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here


PROJECT TITLE : Network Resource Allocation for Users With Multiple Connections Fairness and Stability - 2014 ABSTRACT: This paper studies network resource allocation between users that manage multiple connections, possibly

Ready to Complete Your Academic MTech Project Work In Affordable Price ?

Project Enquiry