PROJECT TITLE :

Hard-Input–Hard-Output Capacity Analysis of UWB BPSK Systems With Timing Errors

ABSTRACT:

The hard-input–hard-output capacity of a binary phase-shift keying (BPSK) ultrawideband system is analyzed for both additive white Gaussian noise and multipath fading channels with timing errors. Unlike previous works that calculate the capacity with perfect synchronization and/or multiple-access interference only, our analysis considers timing errors with different distributions, as well as the interpath (IPI), interchip (ICI), and intersymbol (ISI) interferences, as in practical systems. The sensitivity of the channel capacity to the timing error is examined. The effects of pulse shape, the multiple-access technique, the number of users, and the number of chips are studied. It is found that time hopping is less sensitive to the pulse shape and that the timing error has higher capacity than direct sequence due to its low duty of cycle. Using these results, one can choose appropriate system parameters for different applications.


Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here


PROJECT TITLE :Cost-Optimal Caching for D2D Networks With User Mobility: Modeling, Analysis, and Computational Approaches - 2018ABSTRACT:Caching well-liked files at the user equipments (UEs) provides an efficient way to alleviate
PROJECT TITLE :Design, Analysis, and Implementation of ARPKI: An Attack-Resilient Public-Key Infrastructure - 2018ABSTRACT:This Transport Layer Security (TLS) Public-Key Infrastructure (PKI) is based on a weakest-link security
PROJECT TITLE :Simulation, Analysis, and Verification of Substrate Currents for Layout Optimization of Smart Power ICsABSTRACT:Today circuit failures in Smart Power ICs because of substrate couplings are partially addressed during
PROJECT TITLE :Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent ArmsABSTRACT:Twin-armed cluster tools for semiconductor manufacturing sometimes have had two arms fixed in opposite directions. Recently,
PROJECT TITLE :Modeling, Analysis, and Detection of Internal Winding Faults in Power TransformersABSTRACT:The winding interturn fault is critical in power transformers since its result is not simply comprehensible at lower magnitude

Ready to Complete Your Academic MTech Project Work In Affordable Price ?

Project Enquiry