PROJECT TITLE :

Worst-case flow model of VL for worst-case delay analysis of AFDX

ABSTRACT:

Worst-case delay analysis is important for avionics full duplex switched Ethernet (AFDX) standardised as ARINC 664. The flow model of virtual link (VL) in the worst-case delay analysis of AFDX is inaccurate, which depends only on the parameters of VL and ignores the impact from the network, so it makes the worst-case delay analysis of AFDX impractical. A worst-case flow model of VL, which takes the worst impact from the network into account, is proposed to mend the worst-case delay analysis of AFDX. This worst-case flow model of VL is applied in one of the main theoretical approaches for worst-case delay analysis, the network calculus approach. It assists the network calculus approach to get the real upper bound of delay for VL.


Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here


PROJECT TITLE :Cost-Optimal Caching for D2D Networks With User Mobility: Modeling, Analysis, and Computational Approaches - 2018ABSTRACT:Caching well-liked files at the user equipments (UEs) provides an efficient way to alleviate
PROJECT TITLE :Design, Analysis, and Implementation of ARPKI: An Attack-Resilient Public-Key Infrastructure - 2018ABSTRACT:This Transport Layer Security (TLS) Public-Key Infrastructure (PKI) is based on a weakest-link security
PROJECT TITLE :Simulation, Analysis, and Verification of Substrate Currents for Layout Optimization of Smart Power ICsABSTRACT:Today circuit failures in Smart Power ICs because of substrate couplings are partially addressed during
PROJECT TITLE :Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent ArmsABSTRACT:Twin-armed cluster tools for semiconductor manufacturing sometimes have had two arms fixed in opposite directions. Recently,
PROJECT TITLE :Modeling, Analysis, and Detection of Internal Winding Faults in Power TransformersABSTRACT:The winding interturn fault is critical in power transformers since its result is not simply comprehensible at lower magnitude

Ready to Complete Your Academic MTech Project Work In Affordable Price ?

Project Enquiry